Two Queensland sites at different stages of the development sequence.

Confidentiality on landowner and counterparty detail is treated as posture, not pending. Detail is released as each structural agreement reaches execution.

SEQ-400

400 MW master plan

South East Queensland

Staged 80 / 200 / 400 MW across three contiguous developments on a single controlled parcel.

Status
Stage 1 assembled. Power, water, fibre and land in place. Stage 2 and Stage 3 envelopes diligenced against the same parcel.
Power
Powerlink and Energex engagement underway. Two connection pathways under formal assessment.
Water
Established potable and process water access. Capacity confirmed against the full master plan cooling envelope.
Fibre
7 km route to QCN Fibre under MOFN. Diverse second path via Energex pole-mounted fibre. Subsea adjacency in scope.
Land
25 hectares controlled. Expansion area assembled for Stages 2 and 3.
Open project sheet

QLD-200

200 MW site under origination

Queensland

Second Queensland origination. Transmission corridor identified. Connection enquiry in preparation. Site location withheld until structural landowner agreement.

Status
Origination stage. Shortlist complete. Grid connection screening done.
Power
Transmission corridor identified against 200 MW envelope. Connection enquiry pathway in preparation.
Disclosure
Region-only naming until structural landowner agreement is executed. Detail released on execution.
Open project sheet

Pipeline

Where Continode is sourcing capacity across Australia.

Sydney, New South Wales - 50 to 150 MWBrisbane, Queensland - 400 MW (staged)Adelaide, South Australia - 45 MWHobart, Tasmania - 25 to 100 MWMelbourne, Victoria - 50 to 150 MWPerth, Western Australia - 50 to 150 MWBRISBANE400MW (staged)SYDNEY50-150MWMELBOURNE50-150MWADELAIDE45MWPERTH50-150MWHOBART25-100MW
Brisbane, Queensland400 MW (staged)
Sydney, New South Wales50 to 150 MW
Melbourne, Victoria50 to 150 MW
Adelaide, South Australia45 MW
Perth, Western Australia50 to 150 MW
Hobart, Tasmania25 to 100 MW

Active corridor: Queensland. Origination underway across NSW, Victoria, South Australia and Western Australia. Detail released by region as structural agreements move into execution.